Kamis, 11 Maret 2010

Real World Disaster Recovery

IDG Connect

IDG Connect


Test, test, test. That sums up the wisdom gained by one system administrator who volunteered his services following Hurricane Katrina. In a career spent working in Disaster Recovery (D/R) planning and testing, he discovered there's a big difference between planned and unplanned D/R events. During his career, planned D/R events went fairly smoothly, with plenty of time to prepare. But during a real D/R event, problems you never think of can take center stage.

For a detailed overview of the lessons one administrator learned during a true disaster, download the complimentary whitepaper "Real World Disaster Recovery."It's available right now courtesy of IBM via IDG Connect.


We think you'll find it educational and rewarding.

Best regards,

David Isaac
e-Editor
IDG Connect


Follow IDG Connect





Subscription Services - You are currently subscribed as zabar.s6.siapa@blogger.com. If you do not wish to receive future mailings from IDG Connect please visit: http://www.idgconnect-direct.com/idgconnect_internal.asp?id=34FB2XBFD0X4  (If you cannot click this URL, please copy and paste the full URL into your browser.)

Read IDG Connect's Privacy Policy. As a customer of one of the IDG Communications brands, you became eligible to receive email from IDG Connect.


Copyright © 2009 | IDG Connect | 492 Old Connecticut Path | Framingham MA 01701 USA |
www.idgconnect.com


0 komentar:

About This Blog

  © Free Blogger Templates 'Photoblog II' by Ourblogtemplates.com 2008

Back to TOP